Thu Mar 21, 2013 7:20am EDT
By Brenton Cordeiro
March 21 (Reuters) - London Mining Plc reported a smaller full-year loss, helped by higher iron ore production at its Marampa mine in Sierra Leone, and said it expected output from the mine to more than double in 2013.
The miner said it expected to produce between 3.3 million and 3.6 million dry metric tonnes in 2013, and forecast sales in the range ...
↧